Summary
Overview
Work History
Education
Skills
Languages
Additional Information
Culinary Arts
Physiotherpy
Timeline
Generic

Haneen Sumreen

Amman,March 30,1991

Summary

Experience as a Contractor with [+8] years of experience managing multiple simultaneous responsibilities to foster construction project completion. Well-organized planner and problem-solver versed in site preparation and day-to-day management.

Overview

13
13
years of professional experience

Work History

Maintenance Contractor

The Royal Hashemite Court
01.2012 - Current

Manage and supervise construction works on site to ensure that projects will be delivered on time, within budget, up to employer quality standards, and maintain health and safety standards and measures.


Buildings Maintenance & Landscaping Works :

  • Civil works ( Structural,Finishing ) .
  • MEP Works .


- Delivered high-quality work on time and within budget, earning positive feedback from employer.

- Delivered outstanding service to customers to maintain and extend relationships for future business opportunities.

- Managed multiple projects simultaneously while maintaining strict adherence to deadlines and budgets.

- Coordinated timely delivery of materials and resources to job sites, preventing delays in project timelines.

- Followed routine maintenance checklist.

- Loaded, unloaded, and moved material to and from storage and production areas.

- Performed minor wall repair, installed drywall, and applied wallpaper.

- Reviewed technical documentation to complete equipment maintenance and repair.

- Cleaned and lubricated parts to keep equipment operating at peak performance.

- Used various equipment to remove snow and sprinkled rock salt on walkways to prevent falls.

- Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.

- Increased facility efficiency with proactive identification of areas needing improvement or repair.

- Established strong relationships with clients through consistent communication and responsiveness to their needs.

- Checked for storm damage around property and contacted supervisor with findings.

- Maintained accurate records of completed work orders, service requests, and inventory levels for efficient reporting purposes.

- Reduced downtime by efficiently diagnosing and repairing mechanical, electrical, and plumbing issues.

- Managed renovation projects from start to finish, ensuring on-time completion within budget constraints.

- Streamlined maintenance processes by implementing a work order system to prioritize tasks and track progress.

  • Coordinated with vendors and suppliers for cost-effective procurement of replacement parts and tools.
  • Implemented quality control measures to ensure all work met or exceeded industry standards and client expectations.
  • Improved equipment reliability by conducting thorough preventive maintenance and timely repairs.
  • Optimized workflow by regularly reassessing priorities based on shifting project timelines or emerging issues.
  • Demonstrated adaptability by seamlessly transitioning between different types of maintenance work, from HVAC to electrical to plumbing.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Executed tasks within time and budget constraints.
  • Removed trash and recyclables at end of each shift and disposed of items in proper receptacles.
  • Supervised maintenance functions, working collaboratively with sanitation crews on shop floor upkeep and repairs.

Site Engineer & Quantity Surveyor

Al-Jowf Contracting Company
01.2021 - 08.2021
  • Total Offices Renovation Project - Total Energies

Wadi Saqra-Amman

  • Total Service Stations Maintenance - Total Energies

Governorates of Jordan


- Prepare all needed documents in project's pre construction phase, in coordination
with the contractor, the office, in order to have all requirements fulfilled before
starting construction.
- Revise project's drawings and BOQ before starting construction, and project's
aspects in coordination with the project's team, and report any conflicts or missing
information.
- Supervise works on site on daily basis, inspect all elements accordingly, give
written instructions and keep works going in the right direction and follow up the
inspections.
- Follow drawing ,B.O.Q, and specifications strictly, and ensure that the contractor,
and the works on site do not deviate from them.
Experience:

- Follow up construction time schedule on daily basis, report delay, suggest solutions
and recovery plans, and take the appropriate actions to solve obstacles, in order to
ensure that projects will be handed over on time.
- Ensure that required safety practices are being followed on site.
- Revise reports handed by the contractors, and ensure that it reflects the actual
situation and progress on site.
- Inspect measurements sheets and invoices handed by the contractors, and ensure
that invoices are being received and submitted on time.
- Check shop drawings, as built drawings, and submittals.
- Check and analyze the contractor's claims for time extension and variation orders.
- Answer/Report contractor's queries and site memos, give all the necessary
information to keep the work going smoothly on site.
- Inspect materials delivered on site, and ensure that they matches the specifications
and approved samples.
- Keep the client's representatives aware and satisfied with progress during their site
visits, and follow the correct communication channels for any modification required
from the client on site.
- Preparation/ Check BOQ's in coordination with design division.



Site Engineer

World Towers Construction Co.
10.2020 - 09.2021
  • Royal Guard Clinic Building Project -The Royal Hashemite Court

Raghadan Palace -Amman


  • Headquarter Building Project ( Finishing Phase )-The Royal Hashemite Court

Raghadan Palace -Amman

- Checked technical designs and drawings for adherence to standards.

- Recorded daily events and activities in site diary to evaluate process and improve productivity.

- Oversaw quality control and health and safety matters for construction teams.

- Enhanced site safety by conducting regular inspections and enforcing strict adherence to safety protocols.

- Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.

- Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.

- Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.

- Ordered and tracked delivery of construction materials and supplies from vendors.

- Troubleshot on-site issues promptly using analytical problem-solving skills resulting in minimal delays to the overall schedule.

- Developed comprehensive project plans outlining objectives, scope of work, scheduling timelines, budget allocations, quality control measures, and risk management strategies.

- Delivered projects on time and within budget constraints by effectively managing resources, schedules, and risks.

- Compiled and presented reports explaining project details to non-technical stakeholders.

- Facilitated clear communication between architects, clients, contractors, suppliers ensuring alignment on project goals and expectations throughout all stages of development.

- Drafted and reviewed construction schedules, environmental impact studies and project designs.

- Adhered to timelines to meet quality assurance targets.

- Assisted in bidding process by providing for on-site inspections and preparing take-offs.

- Supervised various municipal works and modernization projects and performed line and grade surveys.

Sub-Contractor ( Plastering & Painting Works)

Madanat Contracting Company
09.2016 - 03.2017

Kuwaiti Embassy Project

Amman-Jordan

Sub-Contractor

Arabian Construction Company, ACC
11.2014 - 04.2015

Amman Rotana Hotel-Parcels Abdali Project

  • Marble Tiling Cladding for Walls & Floors.

Sub-Contractor

Al-Nashashibi Construction Contracting Co.
01.2014 - 07.2014

Interior, Exterior Finishing Works / Plastering & Tiling Works :


  • Coral Tower Building Project

Amman- Al'Abdali Street.


Plastering & Stone Cladding Works

  • Dr.Omar Abdalhadi Villa

Dair Ghbar - Amman


Plastering & Marble Tiling Works

  • Dr.Abdullah Kheer Villa

Na'our


Sub-Contractor

UNEC-ELCOCORDE JV
06.2013 - 12.2013

The Heights,The Lofts,Courtyard 1&2

(Damac Investment & Properties)- Parcels Abdali Project


  • Interior & Exterior Tiling Works.


Quantity Surveyor

Kokash International Holding Jordan
01.2011 - 03.2012

The Boulevard Jordan Al A'bdali

  • Performed measurements for structural and architectural works to prepare cost estimates for projects.
  • Purchased materials and coordinated deliveries to and from construction sites.
  • Facilitated smooth handover processes between stakeholders by preparing detailed final account statements reflecting actual expenditures versus initial estimates.
  • Supported senior management in strategic planning efforts, providing valuable insights into trends affecting the company''s competitive position within the market space.
  • Developed comprehensive cost plans to guide project execution, ensuring financial efficiency and success.
  • Ensured accurate invoicing by reviewing contractor claims for compliance with contract terms and conditions before submission to clients.
  • Reviewed all consultant drawings and made recommendation to adjust site requirements.
  • Reduced budget overruns by accurately forecasting project expenses and monitoring progress against budget allocations.
  • Conducted regular site visits to monitor progress, identify potential issues, and recommend corrective actions as needed.
  • Estimated and analyzed work performed to request payment from clients.
  • Managed subcontractor relationships by setting clear expectations, maintaining open communication channels, and addressing concerns promptly.
  • Increased client satisfaction through consistent delivery of high-quality work products and timely responses to inquiries or concerns.

Education

Associate of Applied Science - Civil Engineering

Diploma Degree in Civil Engineering
Wadi Alseer Training Center UNRWA
2011

High School Diploma -

Rabia'a Aladaweah High School
Amman-Jordan
2009

Skills

  • Software skills :
  • AutoCAD
  • MS Excel
  • MS Project
  • Analytical skills :
  • Ability to analyse project and design risks and take the most optimal solution that can be both cost-effective and time efficient
  • Attention to detail :
  • Ability to spot issues and mistakes and devise a solution to prevent those issues
  • Problem-solving skills :
  • Problem-solving of the issues spotted during design and construction that do not comply with design standards or common construction practices
  • Multitasking Skills :
  • Ability to do multiple things on the same day
  • Project Management Skills
  • Communication Skills
  • Leadership Skills
  • Teamwork Skills

Languages

Arabic
Native language
English
Advanced
C1

Additional Information

Place & Date of Birth : Amman, March 30.1991

Culinary Arts

Luminus Technical University College (LTUC)

Physiotherpy

Hijama - Privet Course 

Timeline

Site Engineer & Quantity Surveyor

Al-Jowf Contracting Company
01.2021 - 08.2021

Site Engineer

World Towers Construction Co.
10.2020 - 09.2021

Sub-Contractor ( Plastering & Painting Works)

Madanat Contracting Company
09.2016 - 03.2017

Sub-Contractor

Arabian Construction Company, ACC
11.2014 - 04.2015

Sub-Contractor

Al-Nashashibi Construction Contracting Co.
01.2014 - 07.2014

Sub-Contractor

UNEC-ELCOCORDE JV
06.2013 - 12.2013

Maintenance Contractor

The Royal Hashemite Court
01.2012 - Current

Quantity Surveyor

Kokash International Holding Jordan
01.2011 - 03.2012

Associate of Applied Science - Civil Engineering

Diploma Degree in Civil Engineering

High School Diploma -

Rabia'a Aladaweah High School
Haneen Sumreen